= Background =
= Background =
Use of Rubble Mound Jetties with the Coastal Modeling System was introduced in 2013. The implementation was not integrated into the Surface-water Modeling System (SMS) interface until SMS 13.0. Since then a few minor adjustments have been made and the feature is now fully supported in SMS 13.2 and later. A technical note is in progress that will demonstrate the use of the SMS 13.2 interface in applying this feature at Dana Point, California. Example files will be available from a link below.
Use of four structure types (Rubble Mounds, Culverts, Weirs, and Tide Gates) with the Coastal Modeling System was introduced in 2013. The implementation for Rubble Mounds was not integrated into the Surface-water Modeling System (SMS) interface until SMS 13.0. A few minor adjustments to this interface were made in version 13.3 of the SMS. There were delays in the implementation of the other three structure types, however, version 13.4 of the SMS will fully implement all four structure types.
 
=SMS Implementation of CMS-Flow Structures=
The following links provide more detailed information about each structure type:
* [[CMS-Flow/RubbleMounds|Rubble Mound Structures]] (SMS 13.0 and later)
* [[CMS-Flow/Weirs|Weirs]] (SMS 13.4 and later)
* [[CMS-Flow/Culverts|Culverts]] (SMS 13.4 and later)
* [[CMS-Flow/TideGates|Tide Gates]] (SMS 13.4 and later)


= Documentation =  
= Documentation =  
A technical note was started in 2024 for the newer implementation of Rubble Mounds. With the implementation of the other structures being imminent in SMS 13.4, the material Rubble Mounds will be incorporated into a larger Special Report in FY25 that covers all four structures. The original methods for implementing these structures in CMS are covered by the technical notes listed below.
{| class="wikitable"
{| class="wikitable"
|+Older SMS 11.2 Implementation
|-
|-
| CHETN   || [https://erdc-library.erdc.dren.mil/xmlui/handle/11681/1989 Implementation of Structures in the CMS: Part I, Rubble Mound]
| 2013 ||ERDC/CHL Technical Note   ||style=width:40em| [https://erdc-library.erdc.dren.mil/xmlui/handle/11681/1989 Implementation of Structures in the CMS: Part I, Rubble Mound]
|-
|-
| CHETN   || Rubble Mound Structures for CMS Applications in SMS 13.2+ (in progress)
| 2013 ||ERDC/CHL Technical Note   || [https://erdc-library.erdc.dren.mil/xmlui/handle/11681/1991 Implementation of Structures in the CMS: Part II, Weir]
|-
| 2013 ||ERDC/CHL Technical Note   || [https://erdc-library.erdc.dren.mil/xmlui/handle/11681/1983 Implementation of Structures in the CMS: Part III, Culvert]
|-
| 2013 ||ERDC/CHL Technical Note   || [https://erdc-library.erdc.dren.mil/xmlui/handle/11681/2000 Implementation of Structures in the CMS: Part IV, Tide Gate]
|}
|}
{| class="wikitable"
|+Newer SMS Implementation
|-
| 2025 ||ERDC/CHL Special Report   ||style=width:40em| Implementation of Structures for CMS Applications in SMS 13.4+ (in progress)
|}
Last update 9/24/2024<br>
[[CMS#Documentation Portal | Back to Documentation Portal]]

Latest revision as of 22:23, 26 September 2024

Background

Use of four structure types (Rubble Mounds, Culverts, Weirs, and Tide Gates) with the Coastal Modeling System was introduced in 2013. The implementation for Rubble Mounds was not integrated into the Surface-water Modeling System (SMS) interface until SMS 13.0. A few minor adjustments to this interface were made in version 13.3 of the SMS. There were delays in the implementation of the other three structure types, however, version 13.4 of the SMS will fully implement all four structure types.

SMS Implementation of CMS-Flow Structures

The following links provide more detailed information about each structure type:

Documentation

A technical note was started in 2024 for the newer implementation of Rubble Mounds. With the implementation of the other structures being imminent in SMS 13.4, the material Rubble Mounds will be incorporated into a larger Special Report in FY25 that covers all four structures. The original methods for implementing these structures in CMS are covered by the technical notes listed below.

Older SMS 11.2 Implementation
2013 ERDC/CHL Technical Note   Implementation of Structures in the CMS: Part I, Rubble Mound
2013 ERDC/CHL Technical Note   Implementation of Structures in the CMS: Part II, Weir
2013 ERDC/CHL Technical Note   Implementation of Structures in the CMS: Part III, Culvert
2013 ERDC/CHL Technical Note   Implementation of Structures in the CMS: Part IV, Tide Gate
Newer SMS Implementation
2025 ERDC/CHL Special Report   Implementation of Structures for CMS Applications in SMS 13.4+ (in progress)


Last update 9/24/2024
Back to Documentation Portal