CMS-Flow/Structures: Difference between revisions

From CIRPwiki
Jump to navigation Jump to search
(Created page with "{{DISPLAYTITLE:CMS Structures - Rubble Mound Jetties (DRAFT)}} = Background = Use of Rubble Mound Jetties with the Coastal Modeling System was introduced in 2013. The implemen...")
 
mNo edit summary
Line 10: Line 10:
| CHETN   || Rubble Mound Structures for CMS Applications in SMS 13.2+ (in progress)
| CHETN   || Rubble Mound Structures for CMS Applications in SMS 13.2+ (in progress)
|}
|}
[[CMS#Documentation Portal | Back to Documentation Portal]]

Revision as of 21:28, 29 September 2022

Background

Use of Rubble Mound Jetties with the Coastal Modeling System was introduced in 2013. The implementation was not integrated into the Surface-water Modeling System (SMS) interface until SMS 13.0. Since then a few minor adjustments have been made and the feature is now fully supported in SMS 13.2 and later. A technical note is in progress that will demonstrate the use of the SMS 13.2 interface in applying this feature at Dana Point, California. Example files will be available from a link below.

Documentation

CHETN   Implementation of Structures in the CMS: Part I, Rubble Mound
CHETN   Rubble Mound Structures for CMS Applications in SMS 13.2+ (in progress)


Back to Documentation Portal