Long wave propagation

From CIRPwiki
Jump to navigation Jump to search

Setup

Quarter Annulus
Quarter Annulus
  • Forcing:
0.3048 m amplitude M2 tide (red cell string)
  • Bottom friction:
0 sec/m^(1/3) (Manning N)
  • Horizontal eddy viscosity:
0 m^2/sec
  • Run duration:
5 days
  • Ramp period:
2 days
  • Time step:
10 min
  • Wall Friction:
Off
  • Grid resolution:
1000 x 1000 m (constant)
  • Number of cells:
23409


Results

The figure below shows a time series of water

levels at the green point shown in the figure above.

Results
Results



Test_Cases