Long wave propagation

From CIRPwiki
Revision as of 20:15, 12 May 2010 by Deleted (talk | contribs) (Created page with '== '''Setup''' == Forcing: 0.3048 m amplitude M2 tide (red cell string) Bottom friction: 0 sec/m^(1/3) (Manning N) Horizontal eddy viscosity: 0 m^2/sec Run duration: 5 days …')
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Setup

Forcing: 0.3048 m amplitude M2 tide (red cell string)

Bottom friction: 0 sec/m^(1/3) (Manning N)

Horizontal eddy viscosity: 0 m^2/sec

Run duration: 5 days

Ramp period: 2 days

Time step: 10 min

Wall Friction: Off

Grid resolution: Constant 1000 x 1000 m

Number of cells: 23409

Quarter Annulus
Quarter Annulus


Results

The figure below shows a time series of water

levels at the green point shown in the figure above.

Results
Results



Test_Cases