Long wave propagation

From CIRPwiki
Jump to navigation Jump to search

Setup

Quarter Annulus
Quarter Annulus
  • Forcing:
0.3048 m amplitude M2 tide (red cell string)
  • Bottom friction:
0 sec/m^(1/3) (Manning N)
  • Horizontal eddy viscosity: 0 m^2/sec

Run duration: 5 days

Ramp period: 2 days

Time step: 10 min

Wall Friction: Off

Grid resolution: Constant 1000 x 1000 m

Number of cells: 23409



Results

The figure below shows a time series of water

levels at the green point shown in the figure above.

Results
Results



Test_Cases