Long wave propagation

From CIRPwiki
Jump to navigation Jump to search

Setup

Quarter Annulus
Quarter Annulus
  • Forcing: 0.3048 m amplitude M2 tide (red cell string)
  • Bottom friction: 0.0 sec/m^(1/3) (Manning N)
  • Horizontal eddy viscosity: :0 m^2/sec
  • Run duration: 5 days
  • Ramp period: 2 days
  • Time step: 10 min
  • Wall Friction: Off
  • Grid resolution: 1000 x 1000 m (constant)
  • Number of cells: 23409


Results

The figure below shows a time series of water

levels at the green point shown in the figure above.

Results
Results



Test_Cases