Cape Fear Inlet

From CIRPwiki
Revision as of 15:58, 1 December 2010 by Rdswgirw (talk | contribs)
Jump to navigation Jump to search

UNDER CONSTRUCTION



Project Objectives

The purpose of this project is to examine the impact of channel realignment on morphology change at the Cape Fear Entrance Channel. The entrance channel to Wilmington Harbor is bounded by Oak Head Island to the west and Bald Head Island to the south east.



Model Setup

The CMS model was used in a nested grid configuration. The wave model grid covered a 16 x 16 km area using a refined grid. The flow model grid was designed much more locally to the project site.



Discussion


References

  • Project information provided by Wilmington District