Test Cases: Difference between revisions
Jump to navigation
Jump to search
Line 5: | Line 5: | ||
# [[Long wave propagation | Long wave propagation ]] | # [[Long wave propagation | Long wave propagation ]] | ||
# [[Spure Dike | Open Channel Flow ]] | # [[Spure Dike | Open Channel Flow ]] | ||
# [[Wind Setup | Analytical Solution for Wind Setup]] | |||
# [[Nested Idealized Inlet]] | # [[Nested Idealized Inlet]] | ||
Revision as of 13:52, 28 October 2010
UNDER CONSTRUCTION
Hydrodynamics
Sediment Transport
Channel Infilling
- Channel infilling by currents (Galappatti and Vreugdenhil 1985)
- Channel infilling by currents and waves parallel to flow (van Rijn 1986)
- Channel infilling by currents and waves perpendicular to flow (van Rijn and Havinga 1993)
Erosion Tests
Salinity
Structures
- Rubble Mound Verification and Sensitivity
- Weir Application and Validation at Bonnet Carre Spillway, MS
- Culvert Application and Validation at White Ditch, MS
Waves
Current-Wave Interaction
- Regular Waves Breaking on a Planar Beach (Visser 1991)
- Random Waves Breaking on a Natural Beach (LSTF 2007)
- Random Waves Breaking on Barred Beach (Kuriyama and Ozaki 1993)
- Random Waves Breaking on Barred Beach (Smith et al. 1993)
- Regular Waves Breaking on a Planar Beach with Three Cusps (Borthwick and Foote 2002)