Under Construction
Hardbottom contours after modifying the channel entrance channel and local groin cells.
1. Shark River Inlet, NJ Workshop Tutorial
- Importing Bathymetric Datasets and Aerial_Photographs
- CMS-Flow_Setup
- CMS-Wave_Setup
- Steering
- Viewing Results and Making_Animations
- Alternative Grids and Other_Functions
- Post Processing
Salinity and current distributions during (a) the flood current and (b) the ebb current.
2. Salinity Calculation at Humboldt Bay, CA
- In this section, the salinity modeling is described to demonstrate the CMS capability at Humboldt Bay, CA. The tutorial covers
- CMS-Flow Setup
- Initial Condition
- Boundary Conditions
Shark_River_Inlet#Post_Processing
3. Grays Harbor, WA Under Construction
Documentation Portal